School Food Tech Room Renovation
Project Overview
JAF Property Group was commissioned to deliver a comprehensive renovation of their Food Tech Room. The project involved a full removal of existing, fitted cupboards, ceiling, flooring and stripping out of gas, electrics and plumbing. Working closely with a trusted contractor, our team conducted efficient, high-quality renovations, spanning less than two months from work commencing to work completion.
Our Works
The renovation works included removing the old kitchen fittings and safely disconnecting the gas supply, while isolating the plumbing and electrical services. New flooring, ceilings, cabinets and fittings were then installed throughout the space.
The floor was levelled and finished with durable, non-slip vinyl flooring suitable for heavy use. A new ceiling and grey waterproof roller blinds were fitted, and the existing extractor fan was replaced with an upgraded unit to improve ventilation.
New kitchen cabinets, stone-effect worktops and additional wall-mounted storage units were installed. A new stainless-steel sink with drainer, taps and grey tiled splashbacks were fitted, along with a separate hand-wash basin and an integrated teacher’s desk.
The existing gas ovens were removed and replaced with electric ovens. The electrical supply was upgraded, including new connections from the main distribution board and the installation of commercial-grade double power sockets. The lighting was also upgraded with modern LED panel lights.
Finally, all visible gas and water pipework was enclosed to provide a neat, clean and finished appearance.
Outcome
The works delivered a fully refurbished, modern and functional teaching kitchen with improved safety, durability and usability. Upgraded finishes, appliances, lighting and services created a high-quality learning environment designed to meet the needs of staff and students.
Through efficient and consistent service delivery, JAF Property Group has established itself as a trusted maintenance and service provider to schools in the Home Counties and West London greater area. All works were carried out in collaboration with specialist contractors and completed during the School’s Summer closure, minimising disruption to staff and students.
Planning a similar project?
Talk to JAF Property Group about refurbishment, maintenance and repairs for your site.