Project Overview

JAF Property Group was commissioned to carry out localised wet pour surface repairs to damaged areas outside the main building. The works involved preparing the affected sections, removing defective material, and installing new wet pour surfacing carefully matched to the existing finish.

02

Our Works

The works involved carrying out repairs to a safety surfacing area to restore its condition, appearance, and performance. They began with the establishment of a safe working area, including the use of cones and barriers where required to protect site users and ensure the works could be carried out safely.

Damaged sections of the existing rubber safety surface were carefully cut out and removed before the underlying areas were prepared. New impact-absorbing safety surfacing was then installed in matching black and light blue finishes, providing a seamless repair that blended with the surrounding area.

The surfacing was laid onto a prepared base to ensure a durable and long-lasting finish suitable for continued use. Following final inspections and site clearance, the works delivered a renewed finish that restored the surface’s appearance and performance.

03

Gallery Of Works

Before works
After works
04

Outcome

Delivered in partnership with the client, the project successfully restored the safety surfacing, creating a safe, durable, and visually consistent environment for users. New impact-absorbing surfacing was installed in matching colours to enhance the appearance and performance of the area, while careful planning and coordination ensured all works were completed safely and efficiently, resulting in a high-quality, long-lasting finish.