Case Study  |  Education

Staff Room Kitchenette Refurbishment

Sector
Education
Completed
August 2026
01

Project Overview

JAF Property Group was commissioned to refurbish the staff room kitchenette, delivering a complete upgrade of the space. The works included the removal of the existing kitchenette and floor coverings, alterations to electrical and plumbing services, redecoration of the area, subfloor preparation, and the installation of new vinyl flooring.

A new kitchenette was then supplied and installed, including new units, worktops, splashback, sink, and tap, together with provisions for client-supplied appliances. All associated services were tested and commissioned, and the project was completed with a thorough clean and final quality inspections to ensure a fully functional, modern, and durable facility for staff use.

02

Our Works

The existing kitchenette was stripped out and removed, including all units, worktops, sink fittings, floor coverings, and redundant services. Electrical and plumbing alterations were completed to suit the revised layout, including modifications for relocated appliances and the reinstatement of the existing water heater.

Walls and surfaces were made good and redecorated, while the subfloor was prepared and levelled prior to the installation of approximately 33m² of hard-wearing wood-effect vinyl flooring.

A new kitchenette was then supplied and installed, comprising base and wall units, sink unit, worktops, splashback, stainless-steel sink, and mixer tap, together with accommodation for client-supplied appliances.

Upon completion, all services were tested and commissioned, the work area was thoroughly cleaned, all waste materials were removed, and final quality inspections were undertaken prior to handover.

03

Before & After

Before works
After works
04

Outcome

The refurbishment works successfully transformed the staff room kitchenette, providing a modern, functional, and durable space with upgraded finishes, flooring, services, and kitchen facilities. The completed installation improves the usability of the area and better supports the day-to-day needs of staff.

Through the successful delivery of these works, we further strengthened our relationship with the client, demonstrating our commitment to delivering high-quality, responsive solutions and reinforcing our position as a trusted partner in the ongoing improvement and maintenance of their facilities.