Project Overview

JAF Property Group completed a full refurbishment and modernisation of the Sixth Form Boys’ Toilets, transforming an outdated facility into a clean, durable, and efficient space that meets modern standards of hygiene, accessibility, and performance.

The project involved a complete strip-out, architectural reconfiguration, and extensive mechanical and electrical (M&E) upgrades, all delivered in strict compliance with health and safety regulations.

02

Our Works

Strip-Out & Reconfiguration

The existing layout was reimagined for improved flow and usability. An internal non-load-bearing wall was removed, and all fixtures and finishes were stripped out, including cubicles, sinks, mirrors, ceilings, and flooring. All waste was responsibly removed and disposed of via licensed carriers.

Flooring

A new sub-base was prepared and levelled, followed by the installation of commercial-grade Altro cap & cove vinyl flooring – a hygienic, slip-resistant, and easy-to-clean surface ideal for high-traffic educational settings.

Cubicles & Sanitaryware

Six new toilet cubicles were installed using Compact Grade Laminate (CGL) partitions and Integrated Plumbing System (IPS) panels for a clean, robust finish. A new CGL vanity unit with four sinks, non-concussive taps, and matching mirrors completed the installation, supporting water efficiency and durability.

Ceiling & Wall Finishes

New ceiling joists and plasterboard were fitted, with access panels installed for ongoing M&E maintenance. The space was finished with full-height White Rock PVC hygienic wall cladding for maximum cleanliness and minimal upkeep.

Mechanical & Electrical (M&E) Installations

Upgrades included a new energy-efficient lighting system, improved ventilation for better airflow, and the relocation of hand dryers to suit the revised layout. Plumbing works were reconfigured to integrate seamlessly with existing service routes.

Additional Works

Following a secondary inspection, JAF supplied and installed a new water heater and associated pipework, including boxing-in and access panels for easy future maintenance while maintaining a neat finish.

03

Gallery Of Works

04

Outcome

The refurbishment delivered a modern, durable, and low-maintenance facility built to withstand the demands of daily student use. With upgraded mechanical systems, hygienic finishes, and a reconfigured layout, the new space provides both practicality and visual appeal – a future-proofed asset that enhances the Sixth Form environment.